Feasibility Assessment:The will require a site visit, review of existing systems and energy use data, possible location, size and usage of a Solar Thermal System.

 

Grant Application: Perform preliminary engineering; determine the size, location, usage and performance of the proposed system. Perform costs and savings analysis, and submit application for state grant.

 

Implementation: This task includes detailed engineering and construction documents, permits, installation, testing and start-up of the system.

 

Monitoring & Maintenance: This will include monitoring the system operation and performance and perform maintenance.